A Request for Bids (“RFB”) has been issued for the Franklin County Sanitary Landfill 2026 Gas Collection & Control System Construction Project. This Project includes, but is not limited to, the installation of vertical gas collection wells; lateral vacuum, air, and force main piping, a road crossing, isolation valves, cleanout piping and fittings, and other miscellaneous related improvements and site restoration activities. The contract duration is approximately ten (10) weeks.

  • RFB Documents are available beginning June 5, 2026, and can be downloaded until 1:30 p.m. (EST), June 26, 2026.
  • A working Bid Tab (Excel spreadsheet) is available as a separate download
  • A mandatory virtual and in-person pre-bid meeting is scheduled for 1:00 p.m. (EST), June 12, 2026.
  • Sealed Bids are due and must be received by SWACO no later than 1:30 p.m. (EST), July 2, 2026.

Download the RFB Documents below.

Publication Date/Time

05/06/2026 1:36 pm

Publication Information

The Columbus Dispatch

Closing Date/Time

07/02/2026 1:30 pm

Submittal Information

Upload Bid in PDF format to link provided

Bid Opening Information

Electronic opening. Bid results will be sent directly to those who downloaded the RFB Documents

Addendum Name

Addendum 2 | RFB FCSL 2026 GCCS Construction Project

Addendum Date/Time

06/24/2026 3:00 pm

Pre-bid Meeting

06/12/2026 1:00 pm

Contact Person

Contact SWACO Procurement in writing only at [email protected] for questions concerning this RFQ. No phone calls please.

Download Available

Until 1:30 pm, July 2, 2026

Fee

None