Bid Number
6030
Category
Status
Bid Recipient
Ryan Incorporated Central $1,051,039
Description
This Project includes but is not limited to the installation of approximately three thousand feet (3000’) of twenty-four inch (24”) HDPE header pipe, approximately three thousand feet (3,000’) of two-inch (2”) HDPE airline, and three thousand feet (3,000’) of four-inch (4”) HDPE forcemain pipe. The duration of construction for the FCSL 2025 GCCS Construction Project (“Project”) is for an approximate contract duration of twelve (12) weeks.
Site visits are optional and must be scheduled and completed prior to April 16, 2025 with Mr. Danny Fannin.
A mandatory pre-bid meeting (in-person or virtual) is scheduled for April 4, 2025 at 1:00 p.m. (EST).
Bids for this Project must be received by SWACO no later than 1:30 p.m. (EST) April 25, 2025.
Download Bid Documents HERE
Download Addendum No 1 HERE
Download Addendum No 2 HERE
Download Rev 2, bid spreadsheet HERE
Download Addendum No. 3 HERE
Download Revised 3, bid spreadsheet HERE
Publication Date/Time
28/03/2025 2:45 pm
Publication Information
Closing Date/Time
25/04/2025 1:30 pm
Submittal Information
Electronic Submission
Bid Opening Information
Electronic Opening
Addendum Name
Addendum 1
Addendum Date/Time
03/04/2025 12:00 am
Pre-bid Meeting
04/04/2025 1:00 pm
Contact Person
Contact SWACO Procurement in writing only at [email protected] for questions concerning this RFB.
Download Available
Until 1:30 p.m., Apr 25, 2025
Fee
None
Business Hours
8:00 a.m. to 5:00 p.m.
